Thank you to the team for coming out and spending your Saturday working on the car. Most of the Chassis work is completed now with the brakes and front suspension being completed this weekend!
Based on the work I can think of that needs to be completed we have at least 9 or 10 Saturdays of work left to get the car ready to start tuning.
My initial plan for next Saturday 10am to 10pm is below: ( let me know if this works for everyone or if you would rather do something else)
Will: Install water pump and alternator (2 Saturdays)
Don: Rebuild and install brake master, fabricate and install drive shaft
Marcus: Install remote oil filter, oil cooler and oil accumulator (2 Saturdays)
Dondo: Bleed brakes, remove rear speaker brackets, remove jack brackets, remove trans mount brackets, remove all other not needed brackets
Rich: Bleed brakes, fix passenger door, install rear view mirror, install fire extinguisher